29 Results for the search " control":
Author: n.sene
Type: Publication
Date: 2015-04-02
Short-Term Scheduling of Active Distribution Systems
Description:
The latest distribution management systems tend to incorporate optimization functions for the short-term scheduling of the various energy and control resources available in the network (e.g., embedded... see more generators, reactive power compensators and transformers equipped with on-load tap changers). The short-term scheduling procedure adopted in the paper is composed by two stages: a day-ahead scheduler for the optimization of distributed resources production during the following day, an intra-day scheduler that every 15 minutes adjusts the scheduling in order to take into account the operation requirements and constraints of the distribution network. The intra-day scheduler solves a non-linear multi-objective optimization problem by iteratively applying a mixed-integer linear programming (MILP) algorithm. The linearization of the optimization function and the constraints is achieved by the use of sensitivity coefficients obtained from the results of a three phase power flow calculation. The paper shows the application of the proposed approach to a medium-voltage 120 buses network with 10 dispatchable generators and 2 transformers equipped with on-load tap changers.
Authors: A. Borghetti, M. Bosetti, S. Grillo, M. Paolone, F. Silvestro
IEEE Bucharest Power Tech Conference, June 28th - July 2nd, Bucharest, Romania
Tag(s): Distributed generation, operation of distribution networks, MILP.
Author: n.sene
Type: Publication
Date: 2015-04-02
lCT -power Co-simulation Platform for the Analysis of Communication-based Volt/Var Optimization in Distribution Feeders
Description:
The paper presents an ICT and power co-simulation platform for the analysis of the voltlvar control and relevant optimization in medium voltage distribution feeders, achieved by means of a system of d... see moreistributed controllers coordinated via a shared band-limited digital communication network. The platform has been built by realizing the interface between two specific simulation environments:
the Electromagnetic Transient Program EMTP-RV and the communication network simulator Opnet Modeller. The preliminary results provide basic indications on the expected performances of the considered communication-based strategies for ditJerent tratlic congestion levels and load/generation dynamic variations.
Authors: Riccardo Bottura, Alberto Borghetti, Fabio Napolitano, Carlo Alberto Nucci
Tag(s): Co-simulation, Networked Control Systems, Power distribution feeders, Voltlvar optimization.
Author: n.sene
Type: Publication
Date: 2015-04-02
Simulation of the Volt/Var Control in Distribution Feeders by Means of a Networked Multiagent System
Description:
The adoption of networked multiagent systems (MAS) has been recently proposed for the solution of the volt/var control (VVC) problem in distribution feeders. However, constraints and limitations due t... see moreo the communication network, to the dynamic behavior of power system components and regulators, as well as to the measurement uncertainties of the adopted sensors need to be specifically analyzed for the design of the MAS. For this purpose, a cosimulation platform has been built by the integration of two simulation tools:
1) the electromagnetic transient program EMTP-rv; and 2) the communication network simulator Riverbed-OPNET Modeler. This paper presents the modeling and simulation of an asynchronous leaderless MAS-based approach that coordinates the reactive power outputs of a set of power compensators equipped with phasor measurement units via a shared band-limited packet-switched digital communication network. The effects of communication network latency and packet loss on the VVC performances are analyzed for two unbalanced IEEE Test feeders equipped with on-load tap changer transformers. The paper compares the results obtained by using a transmission control protocol (TCP) and a user datagram protocol (UDP), for different levels of background traffic (BT) and different packet discard ratios (PDRs) in the communication links.
Authors: Riccardo Bottura, Student Member, IEEE, and Alberto Borghetti, Senior Member, IEEE
IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, VOL. 10, NO. 4, NOVEMBER 2014
Tag(s): Cosimulation, medium voltage distribution feeders, multiagent systems (MAS), networked control systems (NCS), phasor measurement unit (PMU), volt/var control (VVC).
Author: n.sene
Type: Publication
Date: 2015-04-01
DISPERSED ENERGY RESOURCES SCHEDULING FOR THE INTENTIONAL ISLANDING OPERATION OF DISTRIBUTION SYSTEMS
Description:
The paper presents an algorithm for the automatic optimal scheduling of dispersed energy resources (DERs) and of under-load tap changers (ULTCs) position. The aim of the scheduling problem consists in... see more the minimization of the voltage deviations with respect the rated value, of the DERs production deviation with respect the maximum efficiency point, and of the network losses.
The system incorporates also a procedure to facilitate the intentional islanding maneuver of the distribution network. The adopted approach is based on iterative solution of linear-constrained multi-objective optimization problems. The nonlinear power flow relationships are linearized by means of the calculation of sensitivity coefficients to small variations of the control variables (namely, controllable DERs power outputs and ULTCs positions). The algorithm is implemented in Matlab environment to exploit different solvers and suitably interfaced with EMTP-RV for three-phase power flow detailed calculations. In particular, two optimization solvers are adopted: the least square method and the goal attainment approach. The relevant results are compared using the IEEE 34-node distribution feeder as test case.
Authors: A. Borghetti, C.A. Nucci, M. Paolone, M. Bosetti
Tag(s): Dispersed generation, active distribution networks, islanding operation.
Author: n.sene
Type: Publication
Date: 2015-04-01
Transient recovery voltages in vacuum circuit breakers generated by the early-interruption of the inrush current of large motors
Description:
The switching of medium voltage electrical motors is typically realized by means of vacuum circuit breakers (VCBs) essentially in view of their elevated number of switching cycles. As known, switching... see more of VCBs generates important transient recovery voltages (TRVs)
that need to be properly evaluated in both VCB sizing and in the power system insulation coordination. As large medium voltage electrical motors are installed into plants typically controlled by means of Supervisory Control And Data Acquisition (SCADA) systems,
maneuvers that involve the motor inrush followed by its sudden de-energization (due, in general, to the intervention of an automatic diagnostic function), resulting into important TRVs, are not unusual. The paper aims at investigating the TRVs due to this specific type of
VCB switching by means of a model implemented in the EMTP-RV simulation environment. By making reference to a real plant, the validation of the implemented models is obtained by comparing the simulation results with some experimental transients provided by the plant data fault recorder. The paper finally discusses the adequacy of different countermeasures by analyzing their effectiveness for the TRVs limitation.
Authors: A. Borghetti, F. Napolitano, C.A. Nucci, M. Paolone, M. Sultan, N. Tripaldi
CIGRE - International Symposium “Assessing and Improving Power System Security, Reliability and Performance in Light of Changing Energy Sources” Recife, Pernambuco, Brazil, April 3-6, 2011
Topic 3 – System technical performance
Subtopic 3.5 – Switching and lightning transient on power systems. Impact on performance and measurements
Tag(s): Transient recovery voltages, vacuum circuit breakers, motor inrush currents, EMTP simulations